• Home
  • Mission
  • Background
  • Behind the Scenes
  • More
    • Home
    • Mission
    • Background
    • Behind the Scenes
  • Home
  • Mission
  • Background
  • Behind the Scenes

Construction Tradesman Available for Hire

Construction Tradesman Available for HireConstruction Tradesman Available for HireConstruction Tradesman Available for Hire

Renovation and new construction

Renovation and new constructionRenovation and new construction

Just me, Being Me

Right after finishing the ADU for the contractor, I was directed over to a kind of simple medium sized kitchen refurbish. I performed all of the following tasks using my own tools and passed all necessary inspections working alone without a helper in under 100 hours.

  • Demo 8.5’x18’ kitchen cabinets and countertops, keeping 9 to be repainted
  • Demo under sink plumbing and disposal power, pull dishwasher.
  • Demo click and stick engineered flooring and remove 55 feet of base trim and 96 feet door trim
  • Demo L/R to Kitchen opening to 70” removing kitchen sheetrock only leaving painted sheetrock surface in living room.
  • Frame new wider header,new trimmers
  • Sheetrock new framing
  • Move gas line in wider opening to outside opening, repiping in crawl space and attic through top plate
  • Disconnect 50 gal. gas water heater and pull out
  • Remove 2 -24”x36” fluorescent lights.
  • Frame openings for sheet rock
  • Close in and install sheetrock in openings
  • Patch damaged sheetrock areas with “California” type sheetrock patches and hot mud.
  • Remove 20 years of grime from old cabinet doors and sand for new paint
  • Remove 20 years of grime and hardware from old cabinet face frames and doors and sand for new paint
  • Join 1 new base cabinet to existing base cabinet, cut off 7/16” off rail in existing base cabinet bottom face frame to match new base cabinet dimension.
  • Cut and install 3/4” deck on top of base cabinets for new countertops
  • Install 200 ft.² engineered vinyl plank flooring and underlayment.
  • Install gas, water heater and venting.
  • Change out 11 new outlets and 2 new switches
  • Assist in installing 4 wall cabinets
  • Tape off all cabinets so contractor can spray face frames and exposed sides white 

I Love the Trades

The broken tile mosaic below is something I did for fun on a 16 foot wide, 5 foot tall retaining wall parking pad I built.


Copyright © 2020 Hammerandnail707 All Rights Reserved


-Live simply-Love generously-

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Or don’t accept!

DeclineAccept